Skip to main content

New Cat Multi-Processors speed cycle times, boost crushing force

Caterpillar MP332 Multi-Processor

Cat MP332

Caterpillar has introduced three new Multi-Processors for demolition work that the company says are faster and more powerful than previous models.

The MP332, MP345 and MP365 can cycle 50 percent faster and generate 19 percent more cutting and crushing force than previous models, Cat says.

Cat also designed the excavator attachments to be easier for changing jaw types. One operator can change the jaw within 15 minutes with standard hand tools, thanks to a new locking system, the company says.

Cat designed the Multi-Processors with what it calls “speed booster” technology, in which the system automatically shifts hydraulic action between force (boost mode) and speed mode. In no-load conditions, hydraulic fluid flows rapidly to open the jaw or close it for contact. Once it makes contact, flow goes to cutting/crushing force. Forces range from 460 to 1,270 tons, depending on the model.

Caterpillar MP345 Multi-Processor

Cat MP345

Jaw types for the multiprocessors are as follows:

  • Concrete Cutter – outer jaw cracks concrete and the inner jaw shears steel
  • Demolition – cracks thick concrete structures
  • Pulverizer – crushes concrete, separates rebar
  • Shear – cuts structural steel, pipe, cable
  • Tank Shear – cuts tanks or plate steel at a right angle on three sides
  • Universal – cuts steel and crushes concrete

The company says the Multi-Processors bring greater power to small excavators, and they have a balanced design that keeps the attachment’s center of gravity close to the excavator.

Cat also incorporated control of the Multi-Processors in the operator displays of its Next Gen excavator models.

Standard features include a stand to securely hold unused jaw sets, wear parts to protect the jaws that are easy to replace, and an armored cylinder rod and a protective structure for the cylinder’s body. Cat says most of the cutting blades can be flipped in two ways. That gives four cutting edges that can be used before it’s time to replace the blades.

The multiprocessors can be used on excavators ranging from 32 to 90 tons.

Quick Specs

Caterpillar MP365 Multi-Processor

Cat MP365

 

MP332 MP345 MP365
Carrier weight, tons 32-50 45-65 65-90
Concrete thickness, max., in.
Concrete Cutter* 29.5 33.5 39.4
Demolition 33.5 37.4 43.3
Pulverizer 27.6 29.5 39.4
Universal 27.6
Metal thickness, max., in.
Shear, I-Beam 17.7 19.7 23.6
Shear, H-Beam 11.0 13.4 15.7
Tank Shear, plate thickness 1.2

* MP332 w/concrete cutter can cut I-beams (15.7 in.) and H-beams (10.2 in.); MP345 w/concrete cutter can cut I-beams (17.7 in.) and H-beams (11.0 in.); MP365 w/concrete cutter can cut I-beams (19.7 in.) and H-beams (11.8 in.).



from Equipment World http://bit.ly/2sWfoCt
via Handy Rep Ai

Comments

Popular posts from this blog

List of Best Construction Companies in Bengaluru

Bangalore city which is now renamed as Bengaluru city is one of the biggest IT hubs in India. Bengaluru city has attracted many top construction companies in India to construct huge IT parks across the Bengaluru city. We have compiled a list of best construction companies in Bengaluru so that job seekers who are looking for civil engineering jobs can directly visit the job page of this top construction companies in Bengaluru and apply to appropriate jobs. Scope of top construction companies in Bengaluru Apart from building big IT parks, these leading construction companies in Bengaluru are also involved in construction of residential apartments in Bengaluru area, flats in Bengaluru city, big retail outlets in Bengaluru, hotels in Bengaluru, malls in Bengaluru, commercial spaces in Bengaluru etc. That is why in addition to big construction companies in Bengaluru, this city has also attracted top Architecture companies in India, best construction contractors in India, top scaffoldin...

Raleigh N.C. 540 outer loop faces environmental legal fight

The map above shows the 540 extension’s general location. Credit: NCDOT Environmental groups have filed a petition challenging the planned path of a future outer loop around Raleigh, North Carolina, due to concerns about the effect on nearby waterways that are home to endangered mussels. The $2.2 billion toll highway, an extension of N.C. 540, would complete the southern portion of an expressway outer loop. The construction contract for the first phase was awarded in December , and the N.C. Division of Water Quality recently issued an environmental permit for the project. The Southern Environmental Law Center , along with other environmental groups, is petitioning for an administrative hearing to challenge the environmental permit. The SELC says the proposed highway would “tear through 57,000 linear feet of streams and 70 acres of wetlands.” The groups are also concerned about increased stormwater runoff from the additional pavement from the highway, as well as more greenhouse em...

12 Fast-Growing Shrubs to Plant This Fall

Though spring is traditionally the biggest season for planting, fall is a great time to get in new shrubs. When planted at least a few weeks before the first frost, they have time to get their roots established before winter dormancy, and will be ready to burst forth with foliage and blooms in spring. Check out some of our favorite fast-growing shrubs you should consider planting this fall. from Bob Vila : Trusted Home Renovation & Repair Expert https://ift.tt/2xCFQnv via Handy Rep Ai