Skip to main content

VIDEO: After excavator’s tumble into hole, two more and a dozer required for rescue

 According to the YouTube description of the below machine rescue video, during some excavation for a pumping station, a ledge gave way from beneath this excavator, sending it and the operator tumbling into the very deep hole they had just made.

Two other excavators crawl over to lend a hand, attempting for a while to use the teeth on their bucket to, presumably, tilt their fallen friend’s tracks into a position where they have better traction. When that doesn’t work they try to link buckets with the out of commission digger in the hopes of pulling it out.

That doesn’t work either though, so the trapped excavator operator decides to stab the side of the hole with his bucket and attempt to lift himself out. Nope.

Thankfully, after a bit of digging by the trapped machine to give itself more of a level ramp to exit on (probably the idea that should have been tried in the first place), the excavator is finally able to exit with the help of a dozer.



from Equipment World https://ift.tt/2wqh3lI
via Handy Rep Ai

Comments

Popular posts from this blog

List of Best Construction Companies in Bengaluru

Bangalore city which is now renamed as Bengaluru city is one of the biggest IT hubs in India. Bengaluru city has attracted many top construction companies in India to construct huge IT parks across the Bengaluru city. We have compiled a list of best construction companies in Bengaluru so that job seekers who are looking for civil engineering jobs can directly visit the job page of this top construction companies in Bengaluru and apply to appropriate jobs. Scope of top construction companies in Bengaluru Apart from building big IT parks, these leading construction companies in Bengaluru are also involved in construction of residential apartments in Bengaluru area, flats in Bengaluru city, big retail outlets in Bengaluru, hotels in Bengaluru, malls in Bengaluru, commercial spaces in Bengaluru etc. That is why in addition to big construction companies in Bengaluru, this city has also attracted top Architecture companies in India, best construction contractors in India, top scaffoldin...

Walk-In Interview for Overseas on 2nd May 2018 | Travel Point HR Solutions India | 5 – 25 yrs | Chennai

Walk-In Interview on 2nd May 2018 at Chennai for Overseas Location Saudi Arabia  Candidates should be B.E/ B.Tech / Degree with Min 5 yrs of Exp Candidates from sea water Destination and power Production Walk-In Interview on Wednesday 2nd May 2018 Venue: Travel Point HR Solutions India APJ Buinesss center, 12 Haddows Road, Nungambakkam, Chennai Tamil Nadu – 600006 Contact : MS : Waseema – 9704675049 / 040-33151524                  Mr. Samee – 8886644854 / 040- 33151523 Email Address: e ngineers@travelpointhr.com Electrical Engineer 36 Openings Implementation of policies and procedure Supervising the working staff and updating the periodic maintenance schedule with the concerned parties as their polices following the programs and the working table of preventing maintenance Achieving and following repairing works and the daily maintenance to secure that they matching the required quality according the stander maint...

Raleigh N.C. 540 outer loop faces environmental legal fight

The map above shows the 540 extension’s general location. Credit: NCDOT Environmental groups have filed a petition challenging the planned path of a future outer loop around Raleigh, North Carolina, due to concerns about the effect on nearby waterways that are home to endangered mussels. The $2.2 billion toll highway, an extension of N.C. 540, would complete the southern portion of an expressway outer loop. The construction contract for the first phase was awarded in December , and the N.C. Division of Water Quality recently issued an environmental permit for the project. The Southern Environmental Law Center , along with other environmental groups, is petitioning for an administrative hearing to challenge the environmental permit. The SELC says the proposed highway would “tear through 57,000 linear feet of streams and 70 acres of wetlands.” The groups are also concerned about increased stormwater runoff from the additional pavement from the highway, as well as more greenhouse em...